Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 01/09/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) A DOUBLE 2 CROSS HEADER REQUIRED OVER WEST DOOR 2 X 4'S IN FLAT NOT ALLOWED ON BEARING WALL 2) ELECTRIC SERVICE PANEL REQUIRES 2 LAYERS OF 15 LB BETWEEN PANEL AND WOOD 3) OSB SHEATHIN NOT NAILED 4) PAHD 42 HOLDOWNS TO SHORT-REQUIRE A MINIMUM OF 12 NAILS EACH. PROVIDE ENGINEERS APPROVED REPAIR 5) ANCHOR BOLTS REQUIRED WITHIN 12" OF PLATE SPLICES 6) STUD MISSING WEST WALL 7) SHOWER REQUIRES TEMPERATURE OR PRESSURE BALANCED ANTI-SCALD VALVE 8) FIREPLACE SPARK SHIELD NOT INSTALLED 9) WATER HEATER T & P LINE NOT IN 10) PLAN CALLS FOR DOUBLE LAV IN MASTER BATH. 2 GFCI REQUIRED BUILD TO PLAN OR REVISE PLAN TO AS BUILT AND HAVE APPROVED |