Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/13/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000* |
| 12/12/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*/ 1) LOW PRESSURE TEST S/B MINIMUM OF 10 POUNDS 2) REMOVE PAPER FROM INSULATION AT HALL WAY ABOVE DROP CEILING |
| 12/11/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*/ 1) NEED SHUT OFF FOR FIREPLACE LOG LIGHTER NOTE: CANNOT HAVE PAPER BACK ON INSULATION NOT COVERED-COVER OR REMOVE |
| 12/10/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) PLEASE PROVIDE PRESSURE TEST ON COMPLETE SYSTEM POOL HEATER? 2. NEW GAS LINE TO FIRE PLACE PLUMBER READ OVER SEC 1211.14 NO GAS VALVE INSTALLED AT THIS TIME. |