Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*PLBG. FINAL IS OK 2.) OK FOR C OF O. |
|
| 04/22/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) H.C. LAVATORYS MUST MEET MIN STANDARDS OF ADA SPECS. HEIGHTS AND SIDE CLEARANCE 2.) H.C. URINAL LIP MUST BE 17" A.F.F. AS PER ADA SPECS. MAX. 3.) STANDARDS URINAL LIP MUST BE MAX 24" A.F.F. 4.) CRITICAL LEVEL FOR DISCHARGE TUBES FOR FLUSH VALVES MUST BE MIN 6" FROM C.L. TO TOP OF FIXTURE SEE SECTION: 603.3.1. 94 UPC. 5.) LOUNGE SINK TRAP ARM HAS MORE THAN (1) SLIP JOINT SEE SECTION: 1003.2. 94 UPC. |