Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T01CM04777
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2002 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*1.) PLUMBING FINAL OK 2.) OK FOR C OF O PENDING ANY OTHER INSPECTION 3.) UCC LEFT AT METER. SW GAS 889-1888. | |
10/22/2002 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) URINAL INSTALLED OK 2.) WALKED THROUGH WITH PLUMBER CORRECTION TO BE MADE. | |
10/20/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) PLUMBING CONTRACTOR NOT ON SITE. 2.) HAVE PLUMBER REVIEW ADA REQUIREMENT FOR HANDICAPPED URINAL. | |
10/16/2002 | PLUMBING - FINAL | Denied | 1.) BECAUSE OF THE NUMBER AND NATURE OF THE PLUMBING VIOLATIONS ON THIS SITE, I AM REQUESTING THE NAME, AND COMMERICAL LICENSE NUMBER OF THE PLUMBING CONTRACTOR. | |
10/14/2002 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) PLEASE WRAP GALVANIZED RISERS WITH STYROFOAM BEFORE POURING BACK CONCRETE. 03040 2.) INTERNAL REDUCED PRESSURE ASSEMBLIES CERTIFIED OK 3.) FURNCO NOT APPROVED AT URINAL. USE SHIELDED COUPLING SUPPORT COPPER IN WALL. RECALL FOR INSPECTION. | |
10/10/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) GAS PIPING AND TEST 60# OK 2.) PLUMBING FINAL NOT READY 3.) STILL NEED 03040 YARDWATER AND INTERNAL BACKFLOW CERTIFICATION. | |
10/06/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) YOU HAVE NOT SATISFIED THIS INSPECTORS REQUEST FOR A COMPLETE INSPECTION HISTORY. 2.) I REQUIRE BACKFLOW CERTIFICATION ON THE PROPER FORMS 3.) PLEASE HAVE THE PLUMBER ON SITE AT THE TIME OF THE NEXT INSPECTION. 4.) CONTRACTOR TO PAY RE-INSPECTION FEE. | |
09/30/2002 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*PLUMBING ABOVE CEILING APPROVED 9/20/02 BY RMYERS. PLEASE PROVIDE INSPECTION HISTORY FOR FOLLOWING INSPECTION, 03040 PLUMBING YARDWATER W/RPPBP CERTIFICATION 03050 PLUMBING GAS PRESSURE TEST. 03060 SEPTIC SYSTEM. 1.) GAS PRESSURE TEST ENTIRE SYSTEM (BUT NOT THRU KNSEL VALVE.) WHERE IS THE ANSEL VALVE? NO UNION ABOVE T-BAR. 2.) HAVE PLUMBER REVIEW INDIRECT WASTE PIPING. HAVE PLUMBER REVIEW TABLE 3-1 SUPPORTS FOR HORIZONTAL DRAIN PIPE. 3.) HAVE PLUMBER REVIEW ADA REQUIREMENTS FOR HANDICAPPED BATHROOMS. |