Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T01CM04777
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2002 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection 0000*/ 1) VERIFIED: VALLEY ENERGY (ELECTRICAL) IS DOING THE 2 POLE LIGHTS COMPLETE | |
08/21/2002 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0999*A REINSPECTION FEE IS DUE BEFORE THE NEXT INSPECTION. MISSING K.O. SEALS M.C. CABLE NOT STROPPED, EMT CONDUIT NOT STRAPPED, LOOSE FITTING, NEED ISOLATING TAPE WHERE COPPER AND GALENIZED PIPING MEET, PROPERLY PHASE TAPE ALL M.C. WIRER, MAKE UP ALL BOXER GROUND WIRER. FLEX SEPARATING, M.C. SEPARATING. | |
08/20/2002 | ELECTRIC - INTERMEDIATE | Denied | 1) MISSING K.O. SEALS 2) M.C. CABLE NOT STRAPPED 3) EMT CONDUIT NOT STRAPPED 4) LOOSE FITTING 5) NEED ISOLATING TAPE WHERE COPPER AND GALVENIZED PIPING MEET 6) PROPERLY PHASE TAPE ALL M.C. WIRE 7) MAKE UP ALL BOXES-GROUND WIRE 8) FLEX SEPARATING 9) M.C. SEPARATING 10) A RE-INSPECTION FEE IS DUE BEFORE THE NEXT INSPECTION | |
08/16/2002 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0999$MUST HAVE LETTER FROM LICENSED ELECTRICAL CONTRACTOR FORMAL LETTER SHOW ADDRESS, PROJECT NUMBER. CONTRACTOR TO STATE THAT HE OR SHE SAID COMPANY IS RESPONSIBLE FOR AL THE ELECTRICAL AND IS IN FACT DOING ALL OF THE ELECTRICAL WORK WITH COMPANY EMPLOYEES NOTE: THIS EXACT WILL BE QUOTED ON IVR SYSTEM FOR RETREIVAL BY CONTRACTOR ADDED FAX PAPER OR BRING TO OFFICE | |
08/13/2002 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0999$NEED TO RECEIVE FORMAL LETTER FROM LICENSED C-11 OR K-11 ELECTRICAL CONTRACTOR. STATING THAT SAID CAMPANY IS RESPONSIBLE FOR THE ELECTRICAL WORK AT THIS RETAURANT TO INCLUDE SERVICE, PANEL BOARDS AND ALL, AND THAT SAID COMPANY IS DOING THE WORK IN PROGRESS BY DIRECTLY PAID EMPLOYEES. NEED LETTER PRIOR TO ANY INSPECTION NOTE: LEFT EXACT WRITE UP MESSAGE AS ABOVE ON IVR SYSTEM PLEASE ENTER THIS NOTE ON COMMENTS. | |
08/02/2002 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0999*WILL NEED CONTRACTOR LETTER BEFORE ANY FUTURE INSPECTION. | |
08/01/2002 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* NOT READY PLEASE CAREFULLY FOLLOW PLANS INCLUDED ALL CONDUIT EG 2 1/2 " BUFFET. I NEED A COMPANY LETTER W/LETTER HEAD FROM THE LICENSED ELECTRICAL CONTRACTOR STATES DOING JOB ADDRESS NAME PHONE NUMBER LICENSE NO. SIGNATURE PRIOR TO NEXT INSP. NOTE 4-1" CONDUIT UNDERGROUND TO BUFFET TABLE APPROVED. |