Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T01CM04777
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2002 | BUILDING - FINAL | Approved | OK C OF O. | |
09/30/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) REMOVE DEAD BOLT FROM REAR DOOR. 2.) MOVE T.P DISPENSER OUT OF BOWL AREA IN MENS RESTROOM. 3.) ADA SIGNAGE FOR PARKING AND RESTROOMS REQUIRED. 4.) "DOOR TO REMAIN UNLOCKED WHILE BUILDINGS OCCUPIED" SIGN OVER FRONT DOOR. 5.) PROVIDE FINALS FROM OTHER TRADE INSPECTORS. | |
07/31/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*STOP WORK ORDER LIFTED. | |
05/17/2002 | BUILDING - FINAL | Correction Required | MET ARCHITECT, STRUCTURAL ENGINEER, ELECTRICAL ENGINEER, INSPECTIONS SUPERVISOR, PLUMBING, MECHANICAL, AND ELECTRICAL INSPECTOR AT SITE. SHELL BUILDING CONTRACTOR WAS ALSO AT MEETING; TI CONTRACTOR DID NOT SHOW UP. RESULTS OF MEETING ARE AS FOLLOWS: 1) ARCHITECT WILL DRAW UP REVISIONS FOR ELECTRICAL, MECHANICAL AND PLUMBING CHANGES. 2) STRUCTURAL ENINEER, CONTRACTOR AND POST-TENSION CABLE ENGINEER WILL DEVELOP A SUITABLE REPAIR FOR DAMAGE TO POST-TENSION SLAB. ARCHITECT WILL THEN SUBMIT REPAIR PLANS FOR APPROVAL. 3) STOP WORK REMAINS IN EFFECT UNTIL DSD HAS APPROVED REVISIONS. | |
05/15/2002 | BUILDING - FINAL | Denied | IVRS - Inspection 0999*1.) POST TENSIONED SLAB AND CABLES CUT AND WILL REQUIRE APPROVED ENGINEERED PLANS FO RREPAIR. 2.) FRAMING OF SOFFITS COVERED WITHOUT INSPECTION; ELECTRIC WORK COVERED W/O INSPECTION: ETC. 3.) APPROVED PLANS FOR ROUGH PLUMBING IT MUST BE REVISED AND APPROVED BY C.O.T. 4.) WE REQUESTIGN THAT CONTRACTOR CALL STEVE LONG OF DEVELOPEMENT SERVICE TO ARRANGE AN ON SITE MEETING WITH CONTRACTOR DESIGNER DSD AND OTHER PARTIES WITH INTEREST IN THIS PROJECT. |