Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/20/2002 |
ROOF NAILING |
|
Approved |
IVRS - Inspection 0000* |
| 01/11/2002 |
ROOF NAILING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) OK TO DRY IN |
| 01/10/2002 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) ROOF SHEATHIN MUST BE NAILED AT 6" ON CENTER FOR ALL SUPPORTED ENDS AND EDGES AND 12" ON CENTER IN FIELD 2) PROVIDE 2 X 8 BLOCKING BETWEEN RAFTERS AT EACH END 3) BOLT DOWN PLATES 4) INSTALL H2.5 CLIPS ON EACH END OF RAFTERS 5) REVISE PLAN AND HAVE APPROVED BY CITY OF TUCSON FOR CHANGE IN ROOF-RAFTERS INSTALLED-BEAR ON MASONARY WALLS AND ARE 2 X 10 6) NO. 2. DOUGLAS FIR SPANNING 15'-3" |