Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/16/2003 |
ENGINEERING - FINAL |
|
Approved |
|
| 07/07/2003 |
ENGINEERING - FINAL |
|
Partial Approval |
TEMPORARY C OF O APPROVED, FINAL NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #9190 FOR PERMIT # T01BU02371 IS COMPLETED AND ACCEPTED. THE FOLLOWING ITEMS NEED TO BE ADDRESSED ON THIS SITE: 1) COMPLETE ALL DRAINAGE WAYS ADJACENT TO THIS SITE. 2) COMPLETE ALL ROOF GUTTER INSTALLATIONS AS PREVIOUSLY DISCUSSED. 3) COMPLETE ALL CONCRETE POURS ADJACENT TO THIS SITE, OR PROVIDE BARRIERS TO PREVENT ACCESS INTO THE WORK SITE. |