Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T01CM04307
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2002 | ELECTRIC - FINAL | Approved | OK FINAL. | |
10/04/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* | |
04/02/2002 | ELECTRIC - FINAL | Partial Approval | 1.) PLEASE LABEL WATER HEATER IN BASEMENT AND PROVIDE WORKING CLEARENCES 2.)TIGHTEN SEAL TIGHT FITTINGS FOR COOLERS AND A/C'S ALSO PROTECT SEAL TIGHT WHERE IT PASSES THROUGH THE METAL HOLES 3.) FINISH #5 & #7. 4.) PLEASE PROVIDE GROUNDING FOR BOXES 250-148.OK TEMP C OF O SHOWER ROOMS OFFICES STUDIO UPSTAIRS SUBJECT TO BOND AND OTHER INSPECTION. | |
03/28/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999*.1) PLEASE MOVIE A/C DISCONNECTS TO ALL FOR WORKING CLEARANCES ALSO LABELS. 2.) FINISH PHONE BOARD ROOM. 3.) BONDING JUMPER FOR BONDING THE PNAEL ENCLOSURE IS NEEDED 4.)PLEASE FILL ALL UNUSED OPENINGS FILL ER BLANK & KO SEALS 5.) THE PANELS NEED TO BE LABELED AND THE BREAKERS ALSO 6.) INTERIOR 200 A DISCONNECT NEED BONDING DEVICE AT CONCENTRICS ABOE 250 & 250-9. 7.) PLEASE REVISE PLANS TO REFLECT CHANGES IN SERVICE 8.) NEED TO BOND TO WATER OR BUILDNG STEEL FOR TRANSFORMER. 9.) PLEASE MOVE DATA SO AS TO ACCESS GUTTER COVER. |