Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/24/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :*/ 1) REC'D GAS ISO 2) BOND POSTED FOR GAS |
| 05/10/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 04/20/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) BY WHAT METHOD WAS THE GAS PIPING SIZED? 94 UPC REQUIRES DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION IN ORDER TO SIZE THE PIPE. PROJECTED FOOTAGE INACCURATE. ARE LISTED BTU RATINGS STILL ACCURATE? 2) PROVIDE GAS ISOMETRIC WITH ACCURATE BTU AND FOOTAGE LISTED. |