Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 10/29/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) NEED PLUMBING LINES TESTED |
| 10/25/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) STUDS MISSING AT CLOSET WALL TO HALL BATH 2) COULD NOT CHECK REST OF HOUSE FOR MISSING ANCHOR BOLTS, HOUSE IS INSULATED WITH BLOWN INSULATION-LOOSE FILL FIBERGLASS 3) MOISTURE BARRIER INSTALLED AT CEILING 4) COULD NOT CHECK REST OF HOUSE DO TO FLYING INSULATION, STARTED ITHCING |
| 10/24/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) MISSING HANGERS AT GARAGE HIPS 2) MISSING ANCHOR BOLTS 3) NO GAS TEST 4) PLUMBING NOT COMPLETE AT BATH 5) CHECK FOR MISSING FIREBLOCKING 6) NEED WATER TEST 7) USE #10D NAILS AT HANGERS |