Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 10/08/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
1.) PERMANENTLY MARK OUTSIDE OF PANELS WITH DESIGNATION 2.) MARK ALL PANEL SCHEDULE 3.) INSTALL 2 X 4 FIXTURE COVER UPSTAIRS 4.) LABEL OUTSIDE PANEL AS PANEL D. 5.) INSTALL MISSING COVER AT LOADING DOCK SUMP PUMP. 6.) ADDITIONALLY SECURE AC & HEAT UNIT DISCONNECTS & STRAP FLEX 7.) SEAL HOLE AT STEAM CLEANER DISCONNECT 8.) SECURE WH DESION 2ND FLOOR 2ND BLDG. |