Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/23/2001 |
PLUMBING - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000*1.) ALL CORRECTIONS FROM 9/13/01 MADE OK 2.) OK FOR CEILING TILE. 3.) IN THE FUTURE, THE CEILING TILE DOES NOT GO IN UNTIL AFTER YOU RECEIVE INSPECTION. |
| 09/13/2001 |
PLUMBING - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*1.) SUPPORT RECIRCULATION PUMP 2.) REMOVE FLEX FROM T & P R DRAIN AND HARD PIPE WITH UNION 3.) INSTALL UNION DOWN STREAM OF VALVE ON TRAP PRIMER. |
| 09/03/2001 |
PLUMBING - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) PLUMBING ROUGH ON 19TH FLOOR NEEDS TO BE INSPECTED 2.) PLUMBING ABOVE CEILING, NEED TO SEE FINAL N/H CONNECTION COPPER ABOVE CEILING OK 3.) WATER PRESSURE TEST OK N/H IN WALLS OK OK TO COVER WALLS COPPER IN WALLS OK OK TO COVER WALLS. 4.) OK FOR HARD CEILING IN BATHROOM. |