Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T01CM03659

Parcel: 108213260

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
10/24/2001 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection 0000*REVISED PLAN ON JOB.
10/22/2001 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*1.) ARE ALL CORRECTION LISTED 10/15/01 MADE? 2.) NO HANGER ON HORIZONTAL SINK DRAIN DID YOU COVER UPSTAIRS BEFORE APPROVAL? 3.) NO JOB SUPER AVAILABLE.
10/17/2001 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*PLEASE PROVIDE APPROVED REVISED PLAN.
10/15/2001 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*1.) SUPPORT COPPER VERTICAL TO SINK. 2.) ADD A UNION ON XPANSION TANK 3.) HARD PIPE T & P DRAIN WITH UNION. 4.) REDUCING PAN DRAIN FROM 1" TO 3/4" CONSIDERED AN OBSTRUCTION. 5.) 2" ABS HORIZONTAL TO SINK NEEDS HANGER 6.) REPAIR COUPLINGS ON NEW WORK NOT ACCEPTABLE.
10/10/2001 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*TEST ON ABS OK TEST ON COPPER OK PLEASE PROVIDE APPROVED REVISED DRAWING ON LOCATION OF WATER.
10/09/2001 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*CALL AGAIN.
09/27/2001 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*1ST FLOOR ROUGH ONLY TEST OK OK TO BACKFILL.