Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/24/2001 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000*REVISED PLAN ON JOB. |
| 10/22/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*1.) ARE ALL CORRECTION LISTED 10/15/01 MADE? 2.) NO HANGER ON HORIZONTAL SINK DRAIN DID YOU COVER UPSTAIRS BEFORE APPROVAL? 3.) NO JOB SUPER AVAILABLE. |
| 10/17/2001 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000*PLEASE PROVIDE APPROVED REVISED PLAN. |
| 10/15/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*1.) SUPPORT COPPER VERTICAL TO SINK. 2.) ADD A UNION ON XPANSION TANK 3.) HARD PIPE T & P DRAIN WITH UNION. 4.) REDUCING PAN DRAIN FROM 1" TO 3/4" CONSIDERED AN OBSTRUCTION. 5.) 2" ABS HORIZONTAL TO SINK NEEDS HANGER 6.) REPAIR COUPLINGS ON NEW WORK NOT ACCEPTABLE. |
| 10/10/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*TEST ON ABS OK TEST ON COPPER OK PLEASE PROVIDE APPROVED REVISED DRAWING ON LOCATION OF WATER. |
| 10/09/2001 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000*CALL AGAIN. |
| 09/27/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1ST FLOOR ROUGH ONLY TEST OK OK TO BACKFILL. |