Permit: T01CM03650

Parcel: 14027063A


Addresses:

6351 S TUCSON BL

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
01/03/2003 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection 0000*
09/19/2002 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection 0000*PARTIAL FOOTINGS FOR PERIMETER OF MAIN BUILDING.
09/03/2002 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*1.) EARTHWORK AND ENGINEERED SOIL FILL REPORTS FROM WESTERN TECHOLOGIES REVIEWED AND ACCEPTED. 2.) DETAILS 1 & 2 ON 52 CALL FOR 3/4" ANCHOR BOLTS WITH 3" HOOK UNDER HORIZ. REINFORCEMENT. ANCHOR BOLTS ARE NOT IN PLACE. 3.) PIERS SHOULD BE CENTERED OVER PIER FOOTINGS. MOVE FOOTING OR PROVIDE STAMPED RFI FROM ENGINEER ALLOWING PIERS TO BE AT EDGE OF FOOTING.
08/29/2002 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*1.) PROVIDE SOIL REPORTS FOR ENGINEERED FILL. 2.) COLUMN FOOTING MUST BE COMPLETE AND IN ACCCODANCE WITH DETAIL ON PAGE 52. 3.) CLEAN OUT EXCESSIVE DEBRIS FORM FOOTING. 4.) REBAR MUST BE CLEAN OF EXCESSIVE RUST. 5.) CALLING FOR INSPECTIONS WHEN YOU ARE NOT READY WILL RESULT IN ADDED REINSPECTION FEES.