Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2003 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 09/19/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
IVRS - Inspection 0000*PARTIAL FOOTINGS FOR PERIMETER OF MAIN BUILDING. |
| 09/03/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*1.) EARTHWORK AND ENGINEERED SOIL FILL REPORTS FROM WESTERN TECHOLOGIES REVIEWED AND ACCEPTED. 2.) DETAILS 1 & 2 ON 52 CALL FOR 3/4" ANCHOR BOLTS WITH 3" HOOK UNDER HORIZ. REINFORCEMENT. ANCHOR BOLTS ARE NOT IN PLACE. 3.) PIERS SHOULD BE CENTERED OVER PIER FOOTINGS. MOVE FOOTING OR PROVIDE STAMPED RFI FROM ENGINEER ALLOWING PIERS TO BE AT EDGE OF FOOTING. |
| 08/29/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*1.) PROVIDE SOIL REPORTS FOR ENGINEERED FILL. 2.) COLUMN FOOTING MUST BE COMPLETE AND IN ACCCODANCE WITH DETAIL ON PAGE 52. 3.) CLEAN OUT EXCESSIVE DEBRIS FORM FOOTING. 4.) REBAR MUST BE CLEAN OF EXCESSIVE RUST. 5.) CALLING FOR INSPECTIONS WHEN YOU ARE NOT READY WILL RESULT IN ADDED REINSPECTION FEES. |