Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/16/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000*OK FINAL FILE CABINETS HAVE BEEN MOVED IN FRONT OF ELECTRIC AT THIS TIME IF RELOCATION THERE WILL NEED TO BE PHYSICAL PROTECTING FOR ELECTIC WIRING. |
| 11/14/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
UPS-OK 1.) SEALTITE AND FLEX LAYING ON FLOOR IN PATH TO OFFICE EQUIPMENT. NEEDS PHYSICAL PROTECTION AND POSES A TRIPPING HAZARD 351-4,350-5. 2. DATA LAYING ON FLOOR NEEDS PHYSICAL PROTECTION. |
| 11/07/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*OK TEMP C OF O BUILDING ELECTRIC IS COMPLETE 1.) FINISH INSTALLATION OF OFFICE FURNITURE - LOOSE FITTINGS, PROTECT AT FLEX. 2.) INSTALL UPS SYSTEM FOR INSPECTION. |
| 11/04/2001 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0999*WORK OUT FINISHED A REFEE MAY BE ASSESSED IF INSPECTIONS ARE CALLED WITH NO WORK PROGRESS. PLEASE FINISH ALL ELECTRIC AS DISCUSSED WITH SUPERENTENDANT AND ELECTRICAN. |
| 11/01/2001 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 10/31/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*OK PANELS & GUTTER OK ROOMS & OFFICES 1.) WORKING CLEARANCE ON WATER HEATER DISCONNECT 2.) NEED TO SEE UPS EQUIPMENT 3.) NEED TO SEE OFFICE FURNTURE INSTALLATION. |