Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T01CM03462
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/09/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*PLUMBING FINAL OK 2.) OK FOR C OF O PENDING ANY OTHER INSPECTION. |
|
01/30/2003 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection 0000*A.) ALL CORRECTIONS HAVE BEEN ADDRESSED WITH TWO EXCEPTIONS 1.) VERIFICATION OF CERTIFICATION OF BACKFLOW DEVICES FOR STEAMER WATTS 3/4" OO9 SERIAL #15780. 2.) INSTALLATION OF FLOW CONTROL AT 3 COMP SINK WILL REQUIRE LISTING ON FLOW CONTROL TO VERIFY THAT IT IS DESIGNED FOR INSTALLED SYSTEM AND TRAP. B.) TEMP C OF O SUBJECT TO REVIEW BY STEVE LONG. |
|
01/27/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1. STEAMER: SE 603.0 94UPC BACKFLOW PROTECTION PROVIDE LISTING FOR STEAMER INCLUDING METHOD OF BACKFLOW PROTECTION. 2.) GREASE WASTE: SEE 1011.3 94 UPC LOCATION AND ACCESSIBILITY OF FLOW CONTROL. NOTE: 1 PROVIDE LISTING FOR FLOW CONTROL SHOWING THAT IT IS RATED FOR INSTALLED SYSTEM. 2. FLOW CONTROL WITH BUSHINGS IS CONDERED AN OBSTRUCTION. |
|
01/22/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*NOT READY FOR INSPECTION. 1.) RM #154 FLUSH HANDLE WRONG SIDE. 2.) RM #171 6" MINIMUM FROM TOP OF WC TO CRITICAL TO LEVEL ON FLUSHOMETER 3.) CAULK ALL FIXTURES. 4.) WATER CLOSETS REQUIRE 15" FROM CENTER TO SIDE WALL OR OBSTRUCTION, HANDICAPPED WATER CLOSETS REQUIRE 18" FROM CENTER TO SIDEWALL OR OBSTRUCTION (SANITARY NAPKIN DISPENSER). 5.) NO FLOW CONTROL ON GREASE WASTE. 6.) PROVIDE INSTALLATION MANUAL FOR STEAMER SUBMERGED INLET 7.) SEWER PIPING EXPOSED. SEWER OK OK TO COVER. |
|
11/24/2002 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) NOT READY FOR INSPECTION 2.) CALL IN ALL REQUIRED INSPECTION BEFORE CALLING IN FINAL STILL NEED |
|
09/18/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*UNABLE TO LOCATE APPROVED PLAN OR PERMIT. 2.) READ NOTE FROM 08/30/02. 3.) CONTRACTOR TO PAY RE-INSPECTION FEE. 4.) CALL IN ALL REQUIRED INSPECTIONS, AND HAVE THEM APPROVED BEFORE CALLING IN FINAL. | |
09/17/2002 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
09/13/2002 | PLUMBING - FINAL | Partial Approval | ||
09/13/2002 | PLUMBING - FINAL | Partial Approval | ||
08/30/2002 | PLUMBING - FINAL | Not ready for Inspection | 1.) PLEASE PROVIDE A COMPLETE INSPECTION HISTORY FOR ALL REQUIRED INSPECTIONS ON THIS PERMIT BEFORE CALLING IN FINAL INSPECTIONS. |