Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2002 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*1.) PLUMBING FINAL OK 2.) OK FOR C OF O PENDING ANY OTHER INSPECTIONS 3.) UCC LEFT AT METER. |
| 06/28/2002 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*CONTRACTOR THE FIRST THREE BLDGS ON 20TH ST WERE APPROVE FOR FINAL, WITH THE PROVISION THAT A FEW MINOR CORRECTIONS BE MADE. TO DATE, THESE CORRECTION HAVE NOT BEEN COMPLETED. THESE CORRECTIONS ARE, BUT NOT LIMITED TO CUT CLEAN OUT TO GRADE, SECURE ALL HOSE BIBBS, CAULK ALL FIXTURES INCLUDING TUBS, SHOWERS ETC. I WILL NOT PROCEED ON THIS PROJECT UNTIL THE PLUMBER HAS CAUGHT UP WITH HIMSELF AND AND IN THE FUTURE I WILL HAVE TO STRICTLY INSPECT ALL WORK, AND NOT ALLOW LOOSE ENDS TO BITE ME IN THE REAR. |
| 06/27/2002 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) CAT CLEAN OUTS TO GRADE 2.) CAULK ALL FIXTURES. 3.) SECURE ALL HOSE BIBBS 4.) T & P RELIEF DRAINS TO BE FULL SIZE 5.) SUPPORT EXPANSION TANKS. |
| 06/05/2002 |
PLUMBING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*1.) CONTRACTOR REQUESTING TEMP POWER FOR TESTING, NO CODE ON THIS ACTIVITY FOR 3062. 2.) OK WITH THIS INSPECTOR FOR TEMPORARY POWER. |