Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000* |
| 09/27/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*1.) PLEASE READ NOTE #1 FROM 9/18/01 YOU HAVE NOT PROVIDED AN ISOMETRIC DRAWING WITH DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION. I THINK YOU ARE UNDERSIZED ALSO CHECK FLEX CONNECTOR LENGTH AND SIZE YOU MAY HAVE EXCEEDED ALLOWED LENGTH FOR BTU USE. |
| 09/18/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*1.) PROVIDE APPROVED ISOMETRIC FOR GAS, INCLUDING DEVELOPED LENGTH AND TOTAL BTU OF APPLIANCE 2.)PRESSURE TEST ON 3/4" AT METER GOES TO WHAT? 3.) ONE INCH PIPING TO ANSUL, NOT TESTED. DO NOT TEST THROUGH ANSUL VALVE. |