Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/05/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 08/09/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) OK PENDING RECEIPT OF EPOXY SPECIAL INSPECTION REPORT |
| 08/08/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) HOLDOWN EPOXY ANCHORS NOT PROPERLY INSTALLED, PROVIDE SPECIAL INSPECTION REPORT FOR ALL EPOXY INSTALLED BOLTS 2) 2 X 4 BEARING STUDS NOTCHED GREATER THAN 25 PERCENT-REPLACE 3) NO PRESSURE TEST ON PLUMBING 4) HALL BATH TRAP WEIR HIGHER THAN VENT OPENING 5) PROVIDE BLOCKS FOR NAILING SHEARWALL 2 AT CEILING 6) PROVIDE BLOCKS FOR NAILING SHEARWALL 1 AT CEILING |