Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 01/16/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) FROM METER TO LAST APPL. APPROX 110' TOTAL RUN 1" PIPE GOOD FOR 197 C#4 DEMAND WITH FUTURE RANGE IS 125,000 BTU=114 CFW-1" PIPE OK, OK TO COVER PIPE AT NORTH WEST CORNER (PARTIAL GAS LINE 2) GLAZING NOT INSTALLED YET 3) GAS LINE AND WATER STOPPED AT SAME LOCATION 4) GAS LINE AND WATER YARD LINE PARTIAL, CAPPED OFF AT NORTH WEST CORNER OF BLDG., OK TO COVER FOR STUCCO CREW |