Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 08/24/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 08/22/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) ADD NAILER ON SOUTH END OF ARCH FOR OSB AND STUCCO 2) NO DRY WALL ON FRONT ENTRY CEILING (THEREFORE YOU NEED BRACING ADD A 2 X4 ON EACH END HALF WAY FROM WALL TO CENTER EXISTING 2 X 4 BRACE, STUCCO WILL NOT HOLD THESE TRUSS CHORDS |
| 08/21/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) BLOCK AT OSB CUT FOR ROOF PENETRATIONS (MECH) 2) STIFFEN LARGE ARCH AT FRONT |
| 08/16/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
1) MISSING NAILING ON ROOF DECK 2) BLOCK OSB RUN IN PARALLEL TO RAFTER 3) ADD WIND BRACE FRONT GARAGE NORTH WALL 4) FRONT ARCH, ADD 2 X 4 VERTICAL INSIDE (OUTSIDE AT WALL WHERE ARCH ATTACHES ADD PANELS TO STIFFEN ARCH AND SHEATH BOTTOM, OR HAVE A DETAIL SUBMITTED THAT WORKS, FOR STUCCO 24" ON CENTER VERTICAL STUDS 5) INSTALL COLLAR TIES AT FRONT GABLE 2 X 6 FIELD FRAME 6) AT SHEAR PANELS FRONT ENTRY, ROOF DECK NOT NAILED, SHEAR PANELS NOT NAILED TO DECK, QUESTION PLAN, CALLS FOR DETAIL 5/DT1 SOLID SHEAR, WHY THE SHEAR PANELS 7) ADD 2 X 4 OUT RIGGERS TO SUPPORT ARCH TO MAIN BOX |