Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/19/2001 |
ELECTRIC - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 10/18/2001 |
ELECTRIC - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000*CANCEL BY BRET. |
| 10/17/2001 |
ELECTRIC - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000*CANCELED BY OFFICE. |
| 09/26/2001 |
ELECTRIC - ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*PLANS ON JOB HAVE NO ELECTRICAL APPROVAL STAMPS ON ANY OF THE PAGES ELECTRIC HAS BEEN CHANGE AT VARIOUS LOCATIONS IN BUILDING. SERVICE HAS BEEN INSTALLED DIFFERENT THAN PLANS. PROVIDE REVISED PLANS OR INSTALL AS PER PLANS. |
| 09/18/2001 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*OK RECEPTION, OFFICE #1-3 PRODUCT DISPLAY AREAS. |
| 09/17/2001 |
ELECTRIC - ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*1.) LOOSE FITTINGS AT A/C DISCONNECT. 2.) SUPPORT SEAL TITE AS PER CODE. 3.) NEED BOND SCREW AT A/C DISCONNECT 4.) LOOSE SET SCREW FITTINGS 5.) USE CORRECT SIZE STRAPS TO SECURE M/C CABLE. 6.) PENDANT LIGHTS TO BE WRENCH TITE. |