Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/15/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 04/08/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) GARAGE PLUMBING NOT COMPLETE 2) HOUSE OK, OK TO TAPE HOUSE ONLY 3) THE NEXT TIME THAT GARAGE PLUMBING IS NOT COMPLETE YOU WILL BE CHARGED A RE-INSPECTION FEE |
| 04/03/2002 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) INTERMEDIATES WERE NOT APPROVED, WORK COVERED |
| 03/26/2002 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) HOUSE OK, NOT GARAGE 2) GARAGE PLUMBING NOT READY |
| 02/27/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999$/ 1) GARAGE JOIST HANGER MISSING 2) GARAGE ELECTRIC NOT READY 3) DRAFT STOP FURNACE PLATFORM AT RETRUN AIR 4) RECESSED LIGHTS REQUIRE 1/2" CLEARANCE TO COMBUSTIBLE MATERIAL 5) 4 SWITCH ELECTRIC BOXES MUST BE SUPPORTED ON 2 ENDS 6) LAUNDRY ROOM HAS 3 STUDS BORED GREATER THAN 60 PERCENT OF STUD WIDTH 7) FIRE BLOCK MISSING BY DRYER VENT 8) NAIL PROTECT ALL PLUMBING WITHIN 1 1/4" OF STUD SURFACE 9) PROVIDE PLUMBING D.W.V. WHOLE HOUSE WATER TEST FOR U.P.C. 10) HALL BATH DOWN STAIR BEARING STUDS NOTCHED GREATER THAN 25 PERCENT 11) FIRE STOP ALL DROP CEILINGS AND RAISED FLOORS 12 ) PROVIDE FHA STRAPS ON ALL SILL PLATE CUTS 13) DUCT RESTRICTED AT OFFICE 14) NOTE 6 PAGE 2 NOT COMPLIED WITH-STEEL LINTEL NOT INSTALLED 17) SHOWER FIXTRUES NOT INSTALLED 18) NOTE 23 PAGE 2 NOT COMPLIED WITH 19) BRACED WALL PANEL 1 AT BATHS 2 AND 3 NOT INSTALLED 20) MECHANINCAL DUCTWORK NOT PER PLAN 21) GAS PIPE NOT PER PLAN |
| 02/25/2002 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000$ |
| 02/13/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE WHOLE HOUSE PLUMBING DWV WATER TEST PER UPC 712.2 2) STUCCO SYSTEM WITHIN 3 FEET OF PROERTY LINE MUST BE 7/8" THREE COAT WITH 18 GAGE LATH 3) SERVICE UPGRADE AND CD FEES MUST BE PAID PRIOR TO NEXT INSPECTION, GARAGE LOCATION AND PRE-SLAB OK |