Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 02/15/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 02/14/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0925*/ 1) ALL ABS ROUGH PLUMBING THAT MAYBE IN CONTACT WITH CONCRETE MUST BE WRAPPED WITH AN APPROVED CLOSET WRAP 2) HOLDOWNS NOT INSTALLED 3) NO PLANS ON SITE 4) NEXT FAILURE WILL BE CHARGED A REINSPECTION FEE |
| 02/13/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*/ 1) REINFORCING STEEL IS NOT INSTALLED PER A/4.0, B/4.0, F/4.0 ONE #1 IS REQUIRED 2" BELLOW TOP OF FINISHED FLOOR 2) REVERSE PITCH ON TWO PLUMBING DRAINS 3) ALL ABS PLASTIC THAT MAY BE IN CONTACT WITH CONCRETE MUST BE PROTECTED BY APPROVED PLUMBING CLOSET WRAP 4) UFER GROUND NOT INSTALLED 5) HOLD DOWNS NOT INSTALLED. I CANNOT FIND A LISTING FOR YOUR SPECIFIED 5/PAND42 HOLDOWNS PROVIDE A LISTING OF THE HOLDOWN OR HAVE YOUR PLAN REVISED TO REFLECT THE CORRECT HOLDOWNS |