Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T01CM02566
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2002 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*1.) ALL CORRECTIONS MADE OK 2.) PLUMBING FINAL OK 3.) OK FOR C OF O PENDING ANY OTHER INSPECTIONS. | |
| 02/08/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) INSTALL APPROVED C.O. ADPT AND PLUG ON SEWER. 2.) STRAP EXPANSION TANK 3.) KITCHEN EQUIPMENT NOT INSTALLED PER PLAN 4.) NEED TO SEE CERTIFICATION FOR RPBB. | |
| 09/30/2001 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection 0000*FOR TEMP POWER.1.) OK FOR TEMP POWER. | |
| 09/12/2001 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection 0000*1.) ADMIN BLDG "A" AND CLASSROOMS "C" 1.) ALL CORRECTIONS MADE OK 2.) THE GANG BATHROOM BETWEEN "A" & "C" COMPLETE 3.) NO CORRECTIONS REQ'D THIS AREA ONLY. | |
| 09/10/2001 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*A.) ADMIN AND BLDG "A" CORRECTIONS 1.) URINALS REQUIRE CLEAN-OUTS 2.) 17" AFF MAX FOR H.C. URINAL. 3.) REDUCING PAN DRAIN FROM 1" TO 3/4" CONSIDERED AN OBSTRUCTION. 4.) DRINKING FOUNTAINS NOT INSTALLED 5.) CUT DOWN CLEAN-OUTS OURTSIDE BATHROOMS AND REPLACE RAISED SQ HEAD PLUG TO ELIMINATE TRIPPING HAZZARD 6.) PAN DRAIN, AND T & P RELIEF DRAIN TERMINATION NOT APPROVED OVER CONCRETE SIDE WALK. | |
| 09/07/2001 | PLUMBING - FINAL | Partial Approval | 1.) BLDG "B" PLUMBING FINAL OK 2.) NO CORRECTIONS REQUIRED. | |
| 09/06/2001 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) BLDG "B" VENTS NOT FLASHED PER PLAN. | |
| 08/29/2001 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) SOMEBODY INITIALED CHANGES FROM THE APPROVED PLAN. . RE-SUBMIT INITIALED PLAN FOR CITY APPROVAL. 2.) WHERE IS REVISED PLAN FOR ADDED PLUMBING FIXTURES IN THE BATHROOMS? 3.) NO BATHROOM GROUPS READY FOR INSPECTION 4.) IF THE ARCHETECT IS GOING TO INITIAL CHANGES TO PLAN, HAVE HIM MAKE ALL AS BUILT CHANGES. | |
| 08/28/2001 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) THERE ARE FOUR SETS OF GANG BATHROOM NONE ARE COMPLETE AND ALL REQUIRE MULTIPLE CORRECTIONS 2.) KITCHEN IS NOT READY FOR INSPECTION 3.) NO DRINKING FOUNTAINS HAVE BEEN SETS. | |
| 08/27/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) PLUMBING FINAL NOT READY 2.) REMEMBER, REQUIRE 6" FROM TOP OF URINAL OR WATER CLOSET TO CRITICAL LEVEL OF FLUSH O METER. | |
| 08/19/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) PLUMBING FINAL NOT READY 2.) OK FOR TEMP POWER. | |
| 08/13/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) NOT READY FOR INSPECTION 2.) ROUGH IN IS NOW COMPLETE. | |
| 08/02/2001 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) NOT READY FOR INSPECTION. |