Permit: T01CM02566

Parcel: 137105120


Addresses:

5660 S 12TH AV


Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T01CM02566

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
06/17/2002 BUILDING - FINAL Approved IVRS - Inspection 0000*
06/10/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*
04/10/2002 BUILDING - FINAL Denied IVRS - Inspection 0999*DENIED REVISE PLAN FOR AS BUILT PARKING LOT & BICYCLE PARKING. A REINSPECTION FEE HAS BEEN APPLIED TO THIS PROJECT. FEE MUST BE PAID @ 201 N. STONE.
03/13/2002 BUILDING - FINAL Denied IVRS - Inspection 0999*PARKING FOR AUTOS & BICYCLES MUST BE PER PLAN OR YOU MAY REVISE PLAN
02/15/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*1.) PROVIDE APPROVED SPEC. SHEETS FOR CLASS 1 BICYCLE PARKING 2.)YOU NEED 37 BICYCLE SPACES PER PLAN OR REVISE PLAN. 3.) INSTALL HANDRAILS AT STAGE SO THEY DONT INTERFERE WITH EGRESS.
01/11/2002 BUILDING - FINAL Denied IVRS - Inspection 0999*1.) NEED APPROVED FINAL INSPECTION REPORTS FROM OTHER TRADES 2.) PLACE TRIM OVER EDGE OF CARPET @ ALL STAIRS TO STAGE. 3.) PROVIDE HAND RAILS FOR ALL STEPS UP TO STAGE 4.) IDENTIFY CIRCUIT PANELS IN CAFETERIAN. 5.) PROVIDE SINGLE ACTION DOOR KNOB IN ADMIN OFFICE DATA ROOM 6.) SECURE DRAM PIPES @ RINSE SINK. 7.) SEAL PETRATIONS OR PATCH INTERIOR WALL 8.) PATCH/SEAL CRACKS AND LARGE CHIPS IN STUCCO. 9.) SECURE GUTTER DOWN SPOUTS. 10.) HANDICAPPED URINAL REQUIRES 15" SIDE CLEARANCE. 11.) INSTALL ALL SWITCH RECEPTACLE AND OUTLET COVER PLATES.12.) PATCH HOLES IN ROOF PARAPET. 13.) SUPPORT CONDUIT ON ROOF 10' APART MAX. 14.) SUPPORT PVC DRAM PIPE OR ROOF EVERY 4' 15.) ALL FUSES TO MECHANICAL EQUIPMENT MUST BE IN PLACE.
09/28/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*PA TEMP POWER FOR TESTING.
09/19/2001 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*BUILD "B" DONE EXCEPT I WILL NEED ELEVATOR CERTIFICATIONS.
09/18/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*CANCELLED BY CONTRACTOR.
09/12/2001 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*PARTIAL BUILD A & C COMPLETE OK FOR TEMP POWER ON BUILD "B" TESTING ONLY.
09/11/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*INSPECTION CANCELLED.
09/10/2001 BUILDING - FINAL Denied IVRS - Inspection 0999*1.) BATHROOMS REQUIRE 30" CLEAR DISTANCE IN STALLS IS TO CENTER OF TOILET 2.) URINAL PARTITIONS NOT SECURE.
08/30/2001 BUILDING - FINAL Partial Approval 1.) 2% GRADE MAXIMUM REQUIRED ON HANDICAPPED PARKING SPACES 1A) HANDICAP ACCESS RAMP TO BE NO MORE THAN A 1/12 PITCH 2.) GUARD RAIL HEIGHT TO BE 42" ABOVE NOSE OF STAIR 3.) CAP (WEATHER PROOF) TOP OF EXTERIOR WALLS 4.) CLEAN STUCCO DEBRIS OFF ROOF. 5.) PVC CONDENSATE DRAINS MUST BE RUN TO GROUND LEVEL AND MUST BE PAINTED TO PROTECT FROM UV RAYS 6.) USE PROPER ROOF FLASHINGS ON VENT PENETRATIONS. 7.) SEAL AROUND ELECTRICAL ROOF PENETRATIONS/FLASHINGS 8.) ALL PENETRATIONS THROUGH EXTERIOR WALLS NEED TO BE WHETHER PREFED 9.) PLANS CALL FOR STEEL RISER & PAN @ STAIRWAY - RISER IS CURRENTLY OPEN. 10.) FINISH BATHROOMS (STALLS, SOAP DISPENSER,TOWELL DISPENSERS, MIRRIOR,ETC. 11.) PROVIDE, ONE STUCCO INSPECTION CERTIFICATE 12.) PROVIDE VETILATION TO ALL BATHROOM PER IBC 1202.4.2.1. AND THE IMC 12.)
GRIND ROUGH EDGES AND FINISH PAINTING STAIRS.
14.) PROVIDE CERTIFIED WELD INSPECTION ON STAIR TREADS. OK TEMP C OF O. AND C OF O LANDSCAPING.
08/24/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*BATHROOM CEILING TO BE DRYWALL (PAGE A-7 ROOM FINISH SCHEDULE) 1.) MAY 2% SLOPE FOR ADA PARKING SPACES 2.) BOTTOM STEP 7 1/2 (MAY NOT BE MORE THAN 3/8 FINISH. 3.) NOTE: CHECK HANDICAP HARDWARE OFFICE OFFICE 4.) THESHOLD TO HIGH FOR HANDICAP IN SOME PLACES 5.) GUARD RAILS ON STAIRS CALLED AT 42" THEY ARE ONLY 46" AT NOSE OF TREAD.
08/17/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*
08/13/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*1.) STRIPE PARKING LOT & PROVIDE H.C. SIGNS 2.) BACKFILL TRENCHES & COMPLETE LANDSCAPE 3.) PROVIDE APPROVED FINALS AS LISTED ON THE LIST OF REQUIRED INSPECTIONS. 4.) REDUCE OPENINGS IN GUARD RAILS TO LESS THAN 4" 5.) COMPLETE THE JOB DOORS, HDWE, FLOORING 6.) PROVIDE STABILIZATION FOR WEST SIDE EMBANKMENT 7.) HANG SUSPENDED CEILING WITHIN 8" OF ENDS 8.) POST ADDRESS 9.) POST TOILET ROOMS 10.) LOWER CLEAN OUT IN BREEZE WAY TO FLUSH WITH WALKING SURFACE. 11.) PROVIDE HANDRAILS @ STEPS WITH TWO OR MORE RISERS. (HANDRAILS @ EACH SIDE) ETC.
08/02/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*