Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Approval
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/17/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST FOR ROUGH PLBG. @ SOUTH END OF BLDG IS OK 2.) OK TO BACKFILL TRENCH. 3.) P.O.C. OF NEW BLDG. DRAINS TO EXSISTING BLDG DRAINS ARE OK. 4.) NOTE: ROUGH PLBG ON NORTH SIDE FLOOR SINKS HORIZONTAL VENTS MUST BE 6" A.F.F. 5.) RE TEST SYSTEM ON NORTH SIDE DO NOT COVER. |
| 07/17/2001 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) OK TO BACKFILL TRENCH 3.) ALL CORRECTION HAVE BEEN MADE. |