Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 06/19/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) PROVIDE SHEAR TRANSFER INTERIOR SEE PLAN 4/S4.01 2) PROVIDE SUPPORT AT 4 GANG BOXES HORIZONTAL 3) DRAFT STOP AT FURR DOWN 4) COMPLETE ELECTRICAL FOR GFCI RECEP MASTER LAV 5) PROVIDE TEST TO PEX WATER LINE 6) OK TO INSULATE 7) WORK IN PROGRESS |
| 06/15/2001 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) TO MUCH LEFT UNDONE |
| 06/14/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) MECHANICAL NOT COMPLETE 2) ATTIC FURNACE NOT INSTALLED 3) LOW PRESSURE TEST |