Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/15/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 07/12/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0222* |
| 07/11/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) ALTERNATIVE HOLDOWNS NEED TO BE INSTALLED ON TWO FULL HEIGHT STUDS FROM SOLE PLATE TO DOUBLE TOP PLATE 2) PROVIDE FULL HEIGHT BLOCKING BETWEEN STURRED TRUSSES SEE FRAMING NOTES SHEET GSN AND DETAIL 6/SD2 3) PROVIDE DOUBLE STUDS UNDER BEAM AT WASHROOM UNDER STAIRS 4) SECURE ALL VTR 90 DEGREE ANGLES 5) NAIL DOWN INTERIOR SHEARWALL AT SOLE PLATE 6) BLOCK MECHANICAL PLATFORM RAFTERS AT ENDS FOR LATERAL PROTECTION 7) REMOVE HISH RIB AT CANTILEVER NEEDS INSULATION AT GARAGE FRONT 8) LEAK AT TUB TRAP 2ND FLOOR PROVIDE 42" HIGH TEST WATER 9) PROVIDE ENGINEERING FOR TRUSS FLOOR AT NORTHWEST CORNER BOTTOM CHORD NOTCHED OUT COMPLETELY 16" SPAN 10) PROVIDE 1" DRAFT STOP AT CAVITYS 11) BANG PLATES REQUIRED WHERE ROMEX IS INSTALLED WITHIN 1" OF STUD |