Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 08/03/2001 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 07/16/2001 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*/ 1) PLAN CALLS FOR GARAGE TO BE 3'-0" FROM EAST PROPERTY LINE LAYOUT ASBUILT IS ONLY 2'-7" YOU MUST BUILD TO PLAN OR REVISE PLAN TO ASBUILT AND HAVE APPROVED BY CITY OF TUCSON 2) REINFORCING STEEL IN CONTACT WITH SOIL-REINFORCING STEEL MUST BE 3" FROM SOIL 3) HOLDOWN NOT INSTALLED SEE 2/3 AND 3/3 4) #4 REBAR REQUIRED AT CENTER OF SLAB LINE TOP BAR IN DETAIL 1/3 5) YOUR PLAN AND CODE REQUIRE A GROUNDING SYSTEM FOR THE GARAGE, ARE YOU GOING TO INSTALL A UFER GROUND OR TWO GROUND RODS |