Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/12/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 06/07/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) LOOSE ANCHOR BOLTS THRU OUT 2) SOLE PLATE CRACKED IN HALF AT WEDGE AND ANCHOR BOLTS 3) PROTECT ELECTRIC SEVERAL LOCATIONS 4) DUCTS NOT INSTALLED AS PER PLAN 5) ROOF NOT DRIED IN 6) TAPE AND SEAL WEATHER BARRIER STUCCO MESH |
| 06/06/2001 |
FRAMING |
|
Denied |
1) NEEDS MORE STUDS WHERE DOUBLE GIRDER BEAMS 2) A/C LINES NOT COMPLETE WORK BEING DONE AT INSPECTION |