Permit: T01CM01629

Parcel: 13304009B

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
11/19/2008 ENGINEERING - FINAL Approved All items completed
06/19/2002 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED, FINAL NOT TO BE 1) GIVEN UNTIL THE FINAL GRADING INSPECTION #9190 FOR T01BU01991 HAS BEEN COMPLETED AND ACCEPTED. 2) COMPLETE ALL PREVIOUSLY NOTED COMMENTS MADE ON 5/17/2002
05/17/2002 ENGINEERING - FINAL Partial Approval PROVIDE AND APPROVED SET OF AS-BUILT PLANS FOR THIS SITE SHOWING ALL CHANGES THAT HAVE BEEN MADE TO THE TRASH DUMPSTER LOCATION, TYPE, AND FOR THE LOADING ZONE MODIFICATIONS. COMPLETE THE INSTALLATION OF ALL ASPHALT FOR THIS SITE, THIS INCLUDES ALL AREAS LOCATED WITHIN THE RIGHT OF WAY.
11/21/2001 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED, FINAL NOT TO BE GIVEN UNTIL AFTER FINAL GRADING INSPECTION #9190 HAS BEEN COMPLETED AND ACCEPTED. ADDITIONAL SIDEWALKS MAY BE REQUIRED FOR THIS SITE.