Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 06/21/2001 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
IVRS - Inspection 0000* |
| 06/15/2001 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) 4' LIFT OK |
| 06/13/2001 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
IVRS - Inspection 0999*/ 1) VERTICAL RE-INFORCING STEEL REQUIRED TO BE IN SAME CELLS AS STEM WALL STEEL 2) EACH BLOCK CELL EITHER SIDE OF ALL DOORS AND WINDOWS MUST HAVE VERTICAL REBAR EXTENDING INTO THE STEM WALL |
| 06/11/2001 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
IVRS - Inspection 0950* |
| 06/08/2001 |
REINFORCED MASONRY PRE-GROUT |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NOT READY, CALL FOR INSPECTION WHEN BLOCK BUILT TO 4' HIGH 2) PLANS MUST BE ON SITE |