Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/30/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 05/29/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) COMPLETE PLUMBING AT TUB/SHOWER PROVIDE TEST 2) CHECK AND SECURE LOOSE ANCHOR BOLTS 3) PROTECT ELECTRIC ROMEX WITHIN 1 1/4" FROM EDGE OF STUD 4) LEAK AT LAUNDRY WATER SUPPLY, POST TO BEAM AT BACK PATIO CONNECTION |
| 05/28/2001 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) SECURE PEX AND GAS LINES 2) ISOLATE ROMEX FROM DRYER VENT 3) SEAL PENETRATION AT TORN LATH PAPER 4) SEAL ROMEX AT FLOOR |
| 05/25/2001 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) WORK IN PROGRESS ALL TRADES |