Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
Permit Number - T01CM01468
Inspection Description - PLUMBING - FINAL
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2009 | PLUMBING - FINAL | Denied | 1) PROVIDE APPROVED PLAN AND INSPECTION HISTORY 2) PROVIDE VERIFICATION OF STERILIZATION 3) PROVIDE CLEAN BACTERIA REPORT 4) PROVIDE COPY OF AUTHORITY TO DISCHARGE 5) CONTINUED NOT READYS MAY RESULT IN A REINSPECTION FEE |
|
06/03/2005 | PLUMBING - FINAL | Partial Approval | 1) MEETING WITH DOUG HUMPHREYS, DOMINICK, CHANDRA AND JOSH WHILE ONE INSPECTION REPORT IS MISSING IT LOOKS LIKE ALL POINTS ARE COVERED 2) PLUMBING FINAL OK-OK FOR C OF O PENDING OTHER INSPECTION |
|
05/18/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE CALL IN, AND HAVE APPROVED ALL REQUIRED INSPECTION. 2) AS PER BOB SHERRY, LESS THAN 3,000 GAL A DAY-NO CERT. FROM PDEQ REQUIRED. NORMALLY WE REQUIRE WRITTEN CONFIRMATION TO THIS STATEMENT AS VERBAL OKS DON'T STAND UP IN COURT. 3) AS REQUESTED PREVIOUSLY, PRESSURE TESTING VACUUM TESTING TO BE WITNESSED BY THE INSPECTOR. 4) VERIFICATION OF GRADE OF THE PIPING REQUIRED MANHOLE AS BUILTS ON SITE. | |
05/17/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1 NOT READY | |
05/10/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE CALL IN, AND HAVE APPROVED, ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL INSPECTION. 2) PLEASE REVIEW OUTSTANDING ISSUES WHICH INCLUDE-AS BUILTS INVERTS. VERIFICATION OF GRADE. ALL TESTING. CERTIFICATION FROM PDEQ | |
04/28/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) DETAIL #2 SSE NOT COMPLETED SEE 040805 2) PROVIDE APPROVAL OF CONSTRUCTION BY PDEQ. 3) BACKFLOW CERTIFICATION ON SITE. 4) BACKWATER VALVE NOT INSTALLED. | |
04/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL | |
04/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CALL IN, AND HAVE APPROVED, ALL REQUIREDC INSPECTIONS PRIOR TO CALLING FINAL. 2) CONNECTIONS AT METER COVERED WITHOUT INSPECTIONS. | |
04/13/2005 | PLUMBING - FINAL | Cancelled | ||
04/13/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
03/30/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*1) PLEASE CALL IN AND HAVE APPROVED, ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL. 20 WHERE IS BACKFLOW PROTECTION ON HOSE REELS AND BLK IRON PIPE NOT APPROVED FOR WATER PIPING |