Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/23/2001 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) 1" CLEARANCE FROM FLUE PIPE IN ATTIC WILL BE PROVIDED BY SUPERINTENDENT M.BOND |
| 07/19/2001 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) SEE MANUFACTURERS SPECIFICATIONS FOR MULTIPLE WIRE IN SINGLE NUETRAL HOLES 2) PROVIDE 36" CLEARANCE TO A/C CONDENSOR SERVICE AREA, ALSO 3" CLEARANCE FROM PLATFORM TO EARTH AT CONDENSOR (AC) 3) SEAL RACEWAY AT REFRIGERANT LINE 4) SECURE GAS LINES IN ATTIC AT TERMINATION 5) PROVIDE 1" CLEARANCE FROM COMBUSTIBLE MATERIAL AT FURNACE FLUE PIPE 6) A RE-INSPECTION FEE WILL BE IMPOSED ON EVERY INSPECTION IF SAME RESULTS AT NEXT INSPECITON, APPEARS NO ONE IS WALKING HOUSES PRIOR TO CALLING FOR INSPECTIONS |
| 07/17/2001 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) HOSE BIB AND VACUMN BREAKER NOT INSTALLED 2) POST TENSION TAG NOT INSTALLED AT PLUMBING YARD WATER 3) AC DISCONNECT NOT COMPLETE SECURE FLEX LINE WITHIN 10" OF BOX 36" ON CENTER AFTER |