Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
10/29/2001 BUILDING - FINAL Approved IVRS - Inspection 0000*
10/18/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) HOOD VENT USE KNOCKOUT FOR WIRE FEED WITH PROPER CONNECTOR 2) MISSING FURNACE FLUE-CAP 3) INSTALL DISPOSAL LINE 4) MISSING FRONT COVER TO FIREPLACE
10/10/2001 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) HOLE IN STUCCO AT SERVICE PANEL AREA 2) MISSING A BLANK BREAKER COVER AT SERVICE PANEL 5) A/C NO WHIP CONNECTION 4) MISSING FURNACE FLUE CAP 5) PLUG HOLE IN SERVICE PANEL KNOCKOUT 6) DOOR LOCKED, NO ACCESS