Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2002 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) SEE NOTE #1 AS REQUESTED. |
| 03/27/2002 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*1.) PLGB FINAL IS OK 2.) OK FOR C OF O. |
| 03/21/2002 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999* 1. ALL SINKS REQUIRE CLEAN OUT. CLEAN OUTS TO BE INSTALLED PER 94 UPC REFER TO SECTIONS 310.1 WORKMANSHIP. 707.2 CLEAN OUTS 707.6 LOCATION. 707.10 CLEARANCE. 2.) A WOOD SCREW, DRILLED INTO AN ABS PLUG, IS NOT ACCEPTABLE, USE COUNTER SUNK TAPPED C.O. PLUG W/APP SCREW. 3.) UNABLE TO LOCATE PLUMBER ON JOBSITE. |
| 11/15/2001 |
PLUMBING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*1.) PHASE 1 IS OK FOR TEMP C OF O. AS PER STEVE LONG 2.) NOTE: FINAL C OF O PENDING CODES ADMINISTRATOR APPROVAL OF LETTERS PROVIDED BY ENGINEER. |