Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T01CM00979
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/15/2002 | PLUMBING - ROUGH, SOIL | Approved | ||
01/14/2002 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999*1.) 4" BLDG DRAIN HAS BACK PITCH MIN OF 1% PITCH. 2.) CAN NOT HAVE ANY BUSHINGS IN DRAIN. | |
01/09/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR ROUGH PLBG. IN RM #156,166, 3.) OK TO BACKFILL TRENCH. | |
11/06/2001 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000*1.) HAD MEETING WITH SUPERINTENDENT ON ACID WASTE SYSTEM. | |
10/31/2001 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* | |
07/25/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) P.O.C.OF NEW 10" BLDG. DRAIN TO EXSISTING BLDG. DRAIN IS OK 2.) THIS INSPECTION IS FOR BLDG. DRAIN IN CORRIDOR #160 ONLY 3.) OK TO BACKFILL TRENCH. 4.) NOTE: WILL REQUIRED A REVISED & APPROVED DRAWINGS ON 10" BLDG. DRAIN AND P.O.C. BEFORE FINAL INSPECTION. | |
07/18/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) 4" BLDG SEWER TO MAN HOLE INVERT IS OK 2.) OK TO BACKFILL TRENCH. | |
07/17/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST OK 2.) P.O.C. OF UPSTREAM 10" PVC BLDG SEWER TO MANHOLE IS OK 3.) THIS INSPECTION IS FOR 10" BLDG SEWER FROM NEW MANHOLE TO EXSISTING MANHOLE. | |
07/02/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) 4" BLDG SEWER IS STUBBED OUT TO 20" PAST OF CANOPY 3.) OK TO BACKFILL TRENCH. | |
06/26/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST OK 2.) BLDG SEWER HAS BEEN STUBBED 20' 3.) OK TO BACKFILL TRENCH | |
06/21/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1)SOIL WATER TEST OK. 2)NOTE:FLOOR DRAIN IN WASH DOWN AREA #115 WILL REQUIRE A C.O. DUE TO BRANCH LINE EXCEEDS 5'-0" FROM TRUNK LINE.3)OK TO BACKFILL TRENCH. |
|
06/11/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1)SOIL WATER TEST OK.2)ALL CORRECTIONS HAVE BEEN MADE.3)OK TO BACKFILL TRENCH.4)NOTE:WILL REQUIRE A REVISED AND APPROVED DRAWING PRIOR TO FINAL. |
|
06/08/2001 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999*1)MUST PROVIDE 10' HEAD FOR WATER TEST.2)WILL REQUIRE A FLOOR C.O. WHERE BUILDNG DRAIN EXCEEDS 135'. |