Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/27/2001 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 03/21/2001 |
FRAMING |
|
Prior to Final Inspectn |
1. NEED H20 BOND 2. CHECK GRDING SYS. 3. SERV. PANEL (SERVICEABILITY) 2 60/AMP PLANELS 1" CONDUIT CHECK PERMIT ROOM ADDITIONS. 4. OIL TO SHEET ROCK MASTER BATH. |
| 03/20/2001 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. NEED 10-3 WITH GRD-DRYER CIRCUIT. 2. ISOLATE COPPER FROM METAL STUDS. 3. STAPLE ALL ROMEX 6" MAX FROM EACH BOX 4. SUPPORT (CLEAT) METAL STUDS AT PLUMBING WALL. 5. ISOLATE ROMEX WITH PROPER BUSHINGS AT METAL STUDS. |
| 02/27/2001 |
FRAMING |
|
Not ready for Inspection |
|