Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
Permit Number - T01CM00861
Inspection Description - BUILDING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/18/2002 | BUILDING - FINAL | Not ready for Inspection | ELECTRICAL CONTRACTOR AND WORKERS A8 SITE WORKING DESPITE STOP WORK ORDER. ALSO GC WORKERS DOING SHEETROCK & FRAME WORK GENERAL CONTRACTOR FOR T.I. FU'S CONSTRUCTION NOTIFIED OF INTENT TO ISSUE CITATION FOR FAILURE TO OBEY STOP WORK ORDER. GENERAL CONTRACTOR FOR SHELL BUILDING ALSO @ SITE AND NOTIFIED OF INTENT TO ISSUE. GONZALES INDIO COMMERICAL CONTRACTOR #156294 B-1 FU'S FU'S CONSTRUCTION ROC150376. | |
05/20/2002 | BUILDING - FINAL | Denied | THERE WERE MAJOR STRUCURAL PROBLEMS BROUGHT UP WHEN TI WAS STARTED IN SOUTHERN PART OF BUILDING. POST TENSIONED SLAB AND CABLES WERE IMPROPERLY CUT; COLUMN FOOTERS WERE CHIPPED OUT WITH SOME REBAR CUT; PLUS PLUMBING, ELECTRICAL, AND MECHANICAL REVISIONS WERE REQUIRED. THIS SHELL SHOULD NOT BE FINALED UNTIL REPAIRS AND REVISIONS ARE PROPERLY ACCOUNTED FOR. | |
11/26/2001 | BUILDING - FINAL | Denied | IVRS - Inspection 0999*CALED # BEFORE INSPECTION 8.50 AM. SITE LOCKED: LEFT SITE @ 9.15 AM BUILDING IS NOT EVEN CLOSED TO BEING FINISHED. |