Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2002 |
ELECTRIC - TEMP POWER FOR TEST |
|
Approved |
IVRS - Inspection 0000*PLEASE CLEAR TEMP POWER FUEL & TEST. OK. TO CLEAR TEMP POWER FOR FUEL & TESTING. OK TO ENERGIZE. RTU 1/TRU-2 |
| 12/31/2001 |
ELECTRIC - TEMP POWER FOR TEST |
|
Partial Approval |
GROUNDING BUSHING AND BONDING JUMPER REQUIRED AT ALL NIPPLE FOR SERVICE ENTRANCE RACEWAY BONDING WILL NEED APPROVED REVISION TO MDP. CHANGE IN WIRE SIZE AND BREAKER RATINGS. |
| 12/29/2001 |
ELECTRIC - TEMP POWER FOR TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*JERRY, I TOLD DAV HEAD (ARC), THAT BOND BUSHINGS OR BOND LOCKNUTS ARE REQUIRED IN THE C.T. CAN BECAUSE THE SECONDARY ARE ALREADY MADE UP, I DIDNT WRITE IT DOWN OR CALL IT BECAUSE HE SAID YOU ALREADY LOOKED AT IT AND DIDNT SAY TO. I TOLD HIM THAT WE AS INSPECTORS ARE CALLING THEM ALL THAT WAY OR REQUIEING BONDING PER 250-96 NEC' 99 I WILL LET YOU MAKE THE CALL. HE'S CALLING IT BACK IN FOR MONDAY 12/31/01. THE GEAR WAS NOT COMPLETER ON THE MAKE-UP. |
| 12/28/2001 |
ELECTRIC - TEMP POWER FOR TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000* |