Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T01CM00836
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/14/2001 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
05/10/2001 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0325* 1) PANEL E NEEDS TO HAVE GROUND STRAP TO BOND CAN 2) PANEL B NEEDS GROUNDING BUSS BAR. THERE ARE TOO MANY WIRES INTO A SINGLE LUG 3) BOX BALER DISCONNECT MARK WITH CIRCUITS AND PANEL OF ORIGIN. 4) ELIMINATE SEAL TITE AND RUN EMT. RUNS OF GREATER THAN 6' LENGTHS OF SEAL TITE ARE PROHIBITED BY CODE 5) ADD 4" SQUARE BOXES TO CONDUIT DEAD ENDED, TUCK IN WIRING AND COVER BOX 6) LABEL SERVICE SWITCHES WITH PERMANENT LABELS | |
05/08/2001 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0950* 1) ABOVE CEILING INSP. NEVER REQUESTED AND NEVER DONE. 2) ABOVE CEILING MC CONDUIT MUST BE SUPPORTED WITHIN 12" OF EACH BOX AND AT 6' INTERVALS. 3) NEED INFO. ON CONDUIT RUNS FROM LITING PANEL, TYPE OF WIRE USED, AND NUMBER OF CONDUCTORS IN EACH CONDUIT. 4) OPEN ALL SUB PANELS SO I MAY INSP INTERIOR |