Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/03/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 04/02/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
1. WORK IN PROGRESS FLOOR. JOISTS BEING MOVED AS BUILT EXCEEDS 24' O.C. 2. DETAIL 6/SD3 NOT INSTALLED 2X 6' O.C. 3. 2X BUILT AS POST NEED TO BE FACED NAILED POST MISSING UNDER STAIR BEAM. OK TO PROCEED AT ROOF. |
| 03/30/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
IVRS - Inspection 0000*/1. PROVIDE 1/8 INCH GAP AT ROOF SHEATHIN. NAIL OFF DIAGONAL BRACING BLOCKS THRU ROOF SHEATHIN. 2. PROVIDE POST TO BEAM CONNECTIONS THRU OUT. PROVIDE POST UNDER BEAMS AS PER PLAN. 3. NAIL OFF LOOSE SHEARWALL PANELS AT BACK 2ND FLOOR. 4. FRONT COLUMN HOLDOWN AND WEST SIDE HOLDOWN NOT INSTALLED AS PER PLAN. 5. SHEAR BLKS BETWEEN FLOOR TRUSSES AS BUILT WILL NOT ALLOW TRANSFER MAY REQUIRE HARDWARE |