Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2002 |
ENGINEERING - FINAL |
|
Approved |
|
| 01/22/2002 |
ENGINEERING - FINAL |
|
Partial Approval |
TEMPORARY C OF O APPROVED, THE FOLLOWING ITEMS NEED TO BE ADDRESSED: 1) RE-GRADE THE SLOPES OF BASIN #2 PER THE APPROVED PLANS. 2) SHOW THE APPROVED CHANGES TO THE OUTLET ON AN APPROVED SET OF "AS-BUILT PLANS". 3) THE DRAINAGE OPENINGS IN THE COMMON WALLS ACROSS THE DRAINAGE WAYS DO NOT MATCH THE APPROVED PLANS, THEY BEEN REDUCED CONSIDERABLY. 4) BASIN #1 EAST INLET AND OUTLET HAS BEEN REDUCED IN SIZE. 5)SHOW CHANGES TO THE SOUTHERN BASIN ON THE "AS-BUILT PLANS" FOR THIS SITE. 6) RENEW THE GRADING PERMIT FOR T01BU00755 |