Permit: T01CM00456

Parcel: 117084090


Addresses:

1080 S 10TH AV

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
06/13/2003 ENGINEERING - FINAL Approved
06/12/2003 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU02768 IS COMPLETED AND APPROVED.
05/27/2003 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
1. FINAL C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU02768 IS COMPLETED AND APPROVED. (SEE NOTE #1 ON 5-14-03 INSPECTION REPORT)
2. PROVIDE APPROVED DRAWINGS FOR MODIFICATIONS TO STORMWATER HARVEST BASIN NORTHWEST OF BUILDING.
3. ADDRESS DRAINAGE SWALE EROSION ON EASTSIDE OF BUILDING.
05/14/2003 ENGINEERING - FINAL Partial Approval TEMP0RARY C OF O APPROVED.
1.FINAL C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T01BU02768 IS COMPLETED AND APPROVED.
2. RAINWATER RUN-OFF SHALL BE CONVEYED BELOW SIDEWALKS AND PEDESTRIAN WALKWAYS.
3. PROVIDE SPLASH BLOCKS AND ROCK RIP-RAP FOR ROOF DRAINAGE. PROVIDE DEFINITION OF DRAINAGEWAYS.
4.PROVIDE HANDICAP PARKING AS REQUIRED, OR APPROVAL FROM CRAIG GROSS AT C.O.T. ZONING.