Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T01CM00431
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/10/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* OK TO CLOSE OUT - ELECTRICAL SERVICE AND EQUIP. HAVE BEEN REMOVED |
|
02/14/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*NO ELECTICAL PLANS-SEE NOTES FROM PREVIOUS INSPECTIONS |
|
02/10/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
08/03/2001 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000*OK TO CLEAR.NOT ENERGIZED NO MAIN TEST OR POWER TEST. DO NOT CONTINUE TO CALL FOR FINAL UNTIL YOU HAVE TESTED YOUR SYSTEM AND CAN PROVIDE THE TEST RESULTS FOR THE MAIN CIRCUIT BREAKERS. | |
07/27/2001 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000*TO RECEIVE POWER 1.) POST A BOND FOR TEMP. POWER & FUEL TESTING. 2.) INSTALL ALL FUSES. MUST BE MANUFACTURER,CLASS, & TYPE SPECIFIED BY ENGINEER. 3.) HAVE SYSTEM ENERGIZED AND HAVE THE MAIN CIRCUIT BREAKERS TESTED. SUBMIT COPY OF TEST RESULTS TO INSPECTOR. 4.) COORDINATE TRANSFORMER INSTALLATION AND CONNECTION W/TEP. |