Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/02/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 09/18/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) OK ALL 1025, 1030 EXCEPT CRICKET |
| 09/12/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999*/ 1) NAIL EXTERIOR SHEATHIN AT 8" ENDS AND EDGES AND 12" MAXIMUM SEPERATION IN FIELD-REBAR 2) PROVIDE REQUIRED CROSS VENTALATION UNDER FLOOR 3) ENDS OF EXTERIOR SHEATHIN MUST LAND ON STUDS 4) NAIL ROOF SHEATHIN MAXIMUM SPACING OF NAILS AT 6" ON CENTER ALL SUPPORTED ENDS AND EDGES AND 12" IN FIELD 5) ROOF SHEATHIN MUST SPAN 3 TRUSSES (2 BAYS) 6) ROOF SHEATHIN MUST BE INSTALLED WITH GRAIN PER PENDICTULAR TO TRUSSES NOT PARALLEL 7) PROVIDE CITY OF TUCSON APPROVED PLANS AND TRUSS DRAWINGS 8) STOPPED INSPECTION |