Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/20/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*1.) CONTRACTOR SHADED TRENCH WITH CLEAN FILL AS NATIVE SOILS TOO ROCKY. 2.) OK TO BACKFILL. |
| 08/19/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000$1.) GAS LINES FROM BLDG TO METER LOCATION OK PRESSURE TEST #15 OK 2.) PRIME AND TAPE ALL JOINTS UNDERGROUND 3.) SHADE PIPING WITH CLEAN FILL AND RECALL FOR INSPECTION. |
| 08/07/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000*1.) ABS DWV OK 2.) COPPER WATER PIPE OK 3.) DRAINS OK 4.) CLOSET RINGS OK 5.) OK TO DRYWALL 6.) PRESSURE TEST ON GAS PIPING OK 7.) OK FOR DRYWALL 8.) YARDWATER PIPING OK TRANSITION FITTINGS OK PRESSURE TEST OK OK TO COVER. |